In short

Public-record permit data only — not zoning, feasibility, or legal advice. Records may be incomplete, delayed, or mis-categorized. Check with your city planning department.
About this data
  • 2018 onward: City of San Diego Development Services Department permits that create an ADU or junior ADU. Build type is classified automatically from permit descriptions (see each record's confidence).
  • Costs are declared permit valuations (single-ADU permits only), not final construction costs.
  • The city closes a permit both after its final inspection and after it expires, and its data doesn't say which, so this page doesn't estimate how many permits were finished. Closed permits stay in the counts.

Permits by year

2018242
2019508
2020565
2021757
2022775
20231,331
20241,500
20251,445
2026 so far1,302
Permits by year and type (table)
YearAll ADU permitsGarage conversionsDetached
20182425474
2019508131169
2020565130201
2021757179264
2022775206253
20231,331302420
20241,500302484
20251,445308426
2026 so far1,302221377

“—” means the source for that year does not report ADU type.

Read more: ADU types explained

Not counted above: 87 approved projects with no building permit reported yet.

Not counted: 828 expired or cancelled permits.

ADU Bonus Program

San Diego's ADU Home Density Bonus Program lets owners build extra “bonus” ADUs beyond what state law allows, in exchange for an equal number of ADUs rented at income-restricted rents for 10 to 15 years. Rules in effect since August 22, 2025 (outside the Coastal Zone) allow more than one bonus ADU only near major transit, keep the program out of the city's largest-lot single-family zones, and cap the total ADUs on a single-family lot at 4 to 6 by lot size. In 2025, 194 of the city's 1,445 ADU permits (13%) included a bonus ADU.

YearADU permitsWith a bonus ADUShare
20231,331302%
20241,5001389%
20251,44519413%
2026 so far1,30221116%

Permits whose city record lists at least one bonus ADU; the city records this from 2023 on. Sources: Municipal Code § 141.0302 · Information Bulletin 400.

ADU rules in San Diego

State law check: HCD found the city's 2025 ADU ordinance (O-21989) out of line with state law (October 6, 2025), on fire sprinklers, ADU size on apartment lots, fire setbacks and separate sale. The city responded; HCD hasn't posted a follow-up.

RuleSan Diego's codeState law guarantees
Maximum size1,200 sq ft, attached or detached; at least 150 sq ft. No cap for an ADU inside the house or an existing accessory structure. One ADU up to 800 sq ft is allowed even over the floor-area limit. Junior ADU 150 to 500 sq ft.At least 850 sq ft (1,000 sq ft with 2+ bedrooms) must be allowed; an 800 sq ft detached ADU always is. Conversions of existing space have no size cap. Junior ADU: up to 500 sq ft.
HeightSingle-family lots: detached ADUs (and ADUs attached to an accessory structure) up to 2 stories, within the zone's height limit.Detached: at least 16 ft (18 ft within ½ mile of transit, plus 2 ft for a matching roof). Attached: 25 ft or the zone's limit, whichever is lower.
SetbacksFront setback of the zone (one ADU up to 800 sq ft may encroach). Street side 4 ft or the zone's, whichever is less. Interior side and rear: none up to 16 ft tall; over 16 ft next to homes, 4 ft or the zone's if less; 4 ft in High or Very High Fire Hazard Severity Zones. Conversions keep existing setbacks.No more than 4 ft side and rear; none for conversions of existing space.
ParkingNone, except 1 space per ADU in the Beach Impact Area of the Parking Impact Overlay Zone outside a transit priority area (with exemptions, such as 500 sq ft or less, or attached). Bonus-program ADUs: 1 space each outside a transit priority area.At most 1 space; none within ½ mile of transit and in several other cases. No replacement parking when a garage is converted.
Owner living on siteNone for ADUs. Junior ADU: the owner lives in the house or the junior ADU, under a recorded agreement.None for ADUs. A junior ADU that shares a bathroom with the house requires the owner to live in one of them.
How many on a single-family lotOne ADU inside the house or an existing accessory structure, one attached or detached ADU and one junior ADU. The ADU Home Density Bonus Program can add affordable and bonus ADUs, up to 4, 5 or 6 ADUs and junior ADUs in all, by lot size (8,000 sq ft or less, up to 10,000, larger).One ADU converted from existing space, one junior ADU and one new detached ADU (up to 800 sq ft). From January 1, 2027: two new detached ADUs (a city then needn't allow a junior ADU on that lot).
Short-term rentalsADUs: 31 days or more. The code sets no term for junior ADUs; the city's bulletin says more than 30 days.No guarantee: cities may require rentals of more than 30 days, and junior ADUs can't be short-term rentals.

Where local rules conflict with state law, state law controls. Sources: San Diego Municipal Code 141.0302 (9-2026) · DSD Information Bulletin 400 (January 2026) · Ordinance O-21989 (July 23, 2025) · HCD findings (October 6, 2025) · HCD letter on the ADU bonus program (June 13, 2025); HCD's list of review letters; California ADU rules. Verified Oct 5, 2026. Rules change and every lot is different: confirm with the city before you design.

How long permits take

TypeMedian days, application to permitMiddle halfPermits
Detached ADU230146 – 3652,659
Attached ADU204123 – 3551,197
Garage conversion186107 – 3281,828
Junior ADU (JADU)176110 – 285513
Unclassified274166 – 4372,195

Middle half: the range covering the middle 50% of permits (a quarter were lower, a quarter higher).

Read more: How long ADUs take to build

What neighbors declared as cost

TypeMedian declared valueMiddle halfPermits
Detached ADU$121,493$79,323 – $155,5832,135
Attached ADU$94,432$61,908 – $150,309993
Garage conversion$59,434$42,619 – $86,8741,524
Junior ADU (JADU)$55,842$41,656 – $75,390455
Unclassified$111,827$69,916 – $163,2941,343

Declared permit valuations often understate real construction cost.

Read more: How to choose an ADU builder

An ADU builder serving San Diego? Feature your business on this page.

Questions about ADUs in San Diego

How many ADUs have been permitted in San Diego?

Public records show 8,425 ADU permits in San Diego from 2018 through Nov 4, 2026. 1,445 in 2025, down 4% from 2024.

How long does an ADU permit take in San Diego?

Among the 8,392 ADU permits in San Diego with both dates recorded, half were issued within 224 days of the application; the middle half took 132 to 374 days. That includes plan-check corrections and resubmittals, not just the review itself.

How much does an ADU cost in San Diego?

The median value owners declared on ADU permits in San Diego was $59,434 for garage conversions and $121,493 for detached ADUs. Declared values often leave out design, fees and site work, so get several builder quotes.

Can I build an ADU on my property in San Diego?

California law allows ADUs on most lots with a house, including in San Diego, but what you can build depends on your lot, local rules and utilities. This site shows permits, not eligibility. See California ADU rules.

Where do I apply for an ADU permit in San Diego?

Apply with the City of San Diego Development Services Department, online through its Development Services Application Portal (Building Construction). Official ADU page.

How current is this?

How our data works · Download the data · Free to reuse with credit to SoCal ADU Tracker (socaladutracker.com), under CC BY 4.0.