The short answer

State law waives most fees for a small ADU. An ADU with 750 square feet of interior living space or less (or a junior ADU of 500 or less) owes no impact fees, and one under 500 square feet owes no school fees. What everyone pays is the city's plan check and building permit fees, which are based on the project's value. Bigger units add school fees and impact fees, and a new detached unit can owe utility connection charges (Government Code § 66311.5).

What state law allows, by size

FeeUnder 500 sq ft500 to 750 sq ftOver 750 sq ft
Impact fees (including park fees)NoneNoneIn proportion to the house's size
School feesNoneThe district's rate (standard cap $5.38 per sq ft)The district's rate (standard cap $5.38 per sq ft)
Utility connection and capacity chargesNone in existing space; proportionate otherwiseNone in existing space; proportionate otherwiseNone in existing space; proportionate otherwise
Plan check and building permitYesYesYes

Sizes are interior living space. At exactly 500 square feet the school-fee rule is unclear; ask your school district. A junior ADU (500 square feet or less, inside the house) owes no impact fees.

The rules behind the table

The 750-square-foot impact fee exemption dates from 2020. Since January 1, 2026 (SB 543) it's measured as interior living space, it covers junior ADUs of 500 square feet or less, and the rules moved from § 66324 to § 66311.5.

Coming January 1, 2027

SB 1117, signed September 29, 2026, changes how impact fees on an ADU over 750 square feet are figured: they may be charged only on the area above 750 square feet, instead of in proportion to the size of the house.

Los Angeles

Ventura County

Each city sets its own permit fees, and school fees depend on the district. What official pages say:

For other cities and school districts, ask the city's planning or building department; our Ventura County application guide links each one's ADU page.

Lots that need extra review

Coastal Zone lots need a coastal development permit or exemption, decided within 60 days since October 10, 2025 (Government Code § 66329); in Los Angeles, ZIMAS shows whether a parcel is in the Coastal Zone, and statewide the Coastal Commission has boundary maps. Unincorporated Ventura County doesn't allow junior ADUs in its Coastal Zone until its updated coastal zoning is certified. Hillside and fire-zone lots in Los Angeles can face extra conditions; see hillside, fire-zone, historic and coastal lots.

Budgeting for fees

See also: California ADU rules, pre-approved ADU plans, how to pay for an ADU, what ADUs cost in Los Angeles, choosing a licensed builder.

Summarized from the statutes, the state's ADU Handbook (March 2026) and each agency's page as checked on September 29, 2026. Fee amounts change, often every year; confirm them with your city and school district.

Search your address on the map →

General information, not legal, zoning or financial advice. Rules change and depend on your lot; check with your city before you design or build.