About this data
  • Neighborhood pages cover 2020 onward: City of Los Angeles Department of Building and Safety permits in this neighborhood's Neighborhood Council area, which may not match every local definition of the neighborhood. Build type is classified automatically from permit descriptions.
  • Costs are declared permit valuations (single-ADU permits only), not final construction costs.

Permits by year

20201
20211
20223
20239
20245
20255
2026 so far3
Permits by year and type (table)
YearAll ADU permitsGarage conversionsDetached
2020110
2021100
2022300
2023932
2024510
2025502
2026 so far301

“—” means the source for that year does not report ADU type.

Read more: ADU types explained

How Historic Cultural North compares

ADU rules

Los Angeles' ADU rules apply citywide, with extra rules for hillside, fire-zone and coastal lots: see the rules table.

How long permits take

TypeMedian days, application to permitMiddle halfPermits
Detached ADUtoo few to say5
Attached ADU275193 – 35916
Garage conversiontoo few to say5
Unclassifiedtoo few to say1

Middle half: the range covering the middle 50% of permits (a quarter were lower, a quarter higher).

Read more: How long ADU permits take in Los Angeles (and other cities) · How long ADUs take to build

What happened to these permits

Of the 14 ADU permits issued in Historic Cultural North from 2020 through 2023, including ones that later expired or were cancelled, 71% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 26 months after the permit.

What became of the permitShare
Finished (signed off by the city)71%
Still open29%
Expired or cancelled0%

Expired and cancelled permits aren't in this page's totals; they're included here so the table covers every permit issued. A still-open permit may be under construction or stalled.

What neighbors declared as cost

TypeMedian declared valueMiddle halfPermits
Detached ADUtoo few to say4
Attached ADU$35,000$27,000 – $57,50014
Garage conversiontoo few to say3
Unclassifiedtoo few to say1

Declared permit valuations often understate real construction cost.

Read more: What ADUs cost in Los Angeles

Read more: How to choose an ADU builder

An ADU builder serving Los Angeles? Feature your business on this page.

Recent ADU permits in Historic Cultural North

Street names only. See each permit on the map.

Questions about ADUs in Historic Cultural North

How many ADUs have been permitted in Historic Cultural North?

The City of Los Angeles issued 27 permits for ADUs in Historic Cultural North from 2020 through Oct 31, 2026, including 5 garage conversions and 5 detached ADUs.

How long does it take to build an ADU in Historic Cultural North?

Of the 14 ADU permits issued in Historic Cultural North from 2020 through 2023, including ones that later expired or were cancelled, 71% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 26 months after the permit.

Can I build an ADU on my property in Historic Cultural North?

California law allows ADUs on most residential lots with a house, but what you can build depends on your lot, zoning and hillside or fire-zone rules. This site shows permits, not eligibility; check with the Los Angeles Department of Building and Safety or a licensed builder.

How current is this?

How our data works · Download the data · Free to reuse with credit to SoCal ADU Tracker (socaladutracker.com), under CC BY 4.0.