Public-record permit data only — not zoning, feasibility, or legal advice. Records may be incomplete, delayed, or mis-categorized. Check with your city planning department.
About this data
  • Neighborhood pages cover 2020 onward: City of Los Angeles Department of Building and Safety permits in this neighborhood's Neighborhood Council area, which may not match every local definition of the neighborhood. Build type is classified automatically from permit descriptions.
  • Costs are declared permit valuations (single-ADU permits only), not final construction costs.

Permits by year

20202
20213
20228
20235
202411
20256
2026 so far4
Permits by year and type (table)
YearAll ADU permitsGarage conversionsDetached
2020220
2021311
2022814
2023511
20241132
2025631
2026 so far412

“—” means the source for that year does not report ADU type.

Read more: ADU types explained

Not counted: 1 expired or cancelled permits.

How Rampart Village compares

ADU rules

Los Angeles' ADU rules apply citywide, with extra rules for hillside, fire-zone and coastal lots: see the rules table.

How long permits take

TypeMedian days, application to permitMiddle halfPermits
Detached ADU397175 – 50411
Attached ADU154100 – 33914
Garage conversion148115 – 19811
Unclassifiedtoo few to say2

Middle half: the range covering the middle 50% of permits (a quarter were lower, a quarter higher).

Read more: How long ADU permits take in Los Angeles (and other cities) · How long ADUs take to build

What happened to these permits

Of the 19 ADU permits issued in Rampart Village from 2020 through 2023, including ones that later expired or were cancelled, 68% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 24 months after the permit.

What became of the permitShare
Finished (signed off by the city)68%
Still open27%
Expired or cancelled5%

Expired and cancelled permits aren't in this page's totals; they're included here so the table covers every permit issued. A still-open permit may be under construction or stalled.

What neighbors declared as cost

TypeMedian declared valueMiddle halfPermits
Detached ADUtoo few to say8
Attached ADUtoo few to say8
Garage conversion$50,000$38,875 – $78,75010
Unclassifiedtoo few to say1

Declared permit valuations often understate real construction cost.

Read more: What ADUs cost in Los Angeles

Read more: How to choose an ADU builder

An ADU builder serving Los Angeles? Feature your business on this page.

Recent ADU permits in Rampart Village

Street names only. See each permit on the map.

Questions about ADUs in Rampart Village

How many ADUs have been permitted in Rampart Village?

The City of Los Angeles issued 39 permits for ADUs in Rampart Village from 2020 through Oct 31, 2026, including 12 garage conversions and 11 detached ADUs.

How long does an ADU permit take in Rampart Village?

From application to issued permit, the median in Rampart Village was 148 days for garage conversions and 397 days for detached ADUs.

How much does an ADU cost in Rampart Village?

The median value declared on permits was $50,000 for garage conversions. Declared permit values often understate the full construction cost, so get several builder quotes.

How long does it take to build an ADU in Rampart Village?

Of the 19 ADU permits issued in Rampart Village from 2020 through 2023, including ones that later expired or were cancelled, 68% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 24 months after the permit.

Can I build an ADU on my property in Rampart Village?

California law allows ADUs on most residential lots with a house, but what you can build depends on your lot, zoning and hillside or fire-zone rules. This site shows permits, not eligibility; check with the Los Angeles Department of Building and Safety or a licensed builder.

How current is this?

How our data works · Download the data · Free to reuse with credit to SoCal ADU Tracker (socaladutracker.com), under CC BY 4.0.