Public-record permit data only — not zoning, feasibility, or legal advice. Records may be incomplete, delayed, or mis-categorized. Check with your city planning department.
About this data
  • Neighborhood pages cover 2020 onward: City of Los Angeles Department of Building and Safety permits in this neighborhood's Neighborhood Council area, which may not match every local definition of the neighborhood. Build type is classified automatically from permit descriptions.
  • Costs are declared permit valuations (single-ADU permits only), not final construction costs.

Permits by year

20209
202112
202222
202320
202417
202510
2026 so far14
Permits by year and type (table)
YearAll ADU permitsGarage conversionsDetached
2020923
20211236
20222273
202320105
20241746
20251035
2026 so far1455

“—” means the source for that year does not report ADU type.

Read more: ADU types explained

Not counted: 1 expired or cancelled permits.

How Lincoln Heights compares

ADU rules

Los Angeles' ADU rules apply citywide, with extra rules for hillside, fire-zone and coastal lots: see the rules table.

How long permits take

TypeMedian days, application to permitMiddle halfPermits
Detached ADU244178 – 33632
Attached ADU274115 – 46828
Garage conversion274150 – 42234
Junior ADU (JADU)too few to say1
Unclassifiedtoo few to say7

Middle half: the range covering the middle 50% of permits (a quarter were lower, a quarter higher).

Read more: How long ADU permits take in Los Angeles (and other cities) · How long ADUs take to build

What happened to these permits

Of the 64 ADU permits issued in Lincoln Heights from 2020 through 2023, including ones that later expired or were cancelled, 77% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 16 months after the permit.

What became of the permitShare
Finished (signed off by the city)77%
Still open20%
Expired or cancelled2%
Closed or other status1%

Expired and cancelled permits aren't in this page's totals; they're included here so the table covers every permit issued. A still-open permit may be under construction or stalled.

What neighbors declared as cost

TypeMedian declared valueMiddle halfPermits
Detached ADU$85,000$52,500 – $135,00023
Attached ADU$42,500$25,000 – $115,00026
Garage conversion$50,000$32,000 – $95,00031
Junior ADU (JADU)too few to say1
Unclassifiedtoo few to say8

Declared permit valuations often understate real construction cost.

Read more: What ADUs cost in Los Angeles

Read more: How to choose an ADU builder

An ADU builder serving Los Angeles? Feature your business on this page.

Recent ADU permits in Lincoln Heights

Street names only. See each permit on the map.

Questions about ADUs in Lincoln Heights

How many ADUs have been permitted in Lincoln Heights?

The City of Los Angeles issued 104 permits for ADUs in Lincoln Heights from 2020 through Oct 31, 2026, including 34 garage conversions and 33 detached ADUs.

How long does an ADU permit take in Lincoln Heights?

From application to issued permit, the median in Lincoln Heights was 274 days for garage conversions and 244 days for detached ADUs.

How much does an ADU cost in Lincoln Heights?

The median value declared on permits was $50,000 for garage conversions and $85,000 for detached ADUs. Declared permit values often understate the full construction cost, so get several builder quotes.

How long does it take to build an ADU in Lincoln Heights?

Of the 64 ADU permits issued in Lincoln Heights from 2020 through 2023, including ones that later expired or were cancelled, 77% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 16 months after the permit.

Can I build an ADU on my property in Lincoln Heights?

California law allows ADUs on most residential lots with a house, but what you can build depends on your lot, zoning and hillside or fire-zone rules. This site shows permits, not eligibility; check with the Los Angeles Department of Building and Safety or a licensed builder.

How current is this?

How our data works · Download the data · Free to reuse with credit to SoCal ADU Tracker (socaladutracker.com), under CC BY 4.0.