Public-record permit data only — not zoning, feasibility, or legal advice. Records may be incomplete, delayed, or mis-categorized. Check with your city planning department.
About this data
  • Neighborhood pages cover 2020 onward: City of Los Angeles Department of Building and Safety permits in this neighborhood's Neighborhood Council area, which may not match every local definition of the neighborhood. Build type is classified automatically from permit descriptions.
  • Costs are declared permit valuations (single-ADU permits only), not final construction costs.

Permits by year

202052
202183
2022101
202386
202490
202596
2026 so far78
Permits by year and type (table)
YearAll ADU permitsGarage conversionsDetached
202052407
2021835713
20221016222
2023865016
2024904523
2025964925
2026 so far784115

“—” means the source for that year does not report ADU type.

Read more: ADU types explained

Not counted: 18 expired or cancelled permits.

How Mid City West compares

ADU rules

Los Angeles' ADU rules apply citywide, with extra rules for hillside, fire-zone and coastal lots: see the rules table.

How long permits take

TypeMedian days, application to permitMiddle halfPermits
Detached ADU243160 – 378119
Attached ADU14880 – 28983
Garage conversion163110 – 261339
Junior ADU (JADU)too few to say6
Unclassified16295 – 22825

Middle half: the range covering the middle 50% of permits (a quarter were lower, a quarter higher).

Read more: How long ADU permits take in Los Angeles (and other cities) · How long ADUs take to build

What happened to these permits

Of the 340 ADU permits issued in Mid City West from 2020 through 2023, including ones that later expired or were cancelled, 82% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 14 months after the permit.

What became of the permitShare
Finished (signed off by the city)82%
Still open13%
Expired or cancelled5%
Closed or other status<1%

Expired and cancelled permits aren't in this page's totals; they're included here so the table covers every permit issued. A still-open permit may be under construction or stalled.

What neighbors declared as cost

TypeMedian declared valueMiddle halfPermits
Detached ADU$85,000$50,000 – $160,00093
Attached ADU$33,500$21,000 – $73,75046
Garage conversion$45,000$30,000 – $70,000318
Junior ADU (JADU)too few to say6
Unclassified$32,000$20,000 – $65,00021

Declared permit valuations often understate real construction cost.

Read more: What ADUs cost in Los Angeles

Read more: How to choose an ADU builder

An ADU builder serving Los Angeles? Feature your business on this page.

Recent ADU permits in Mid City West

Street names only. See each permit on the map.

Questions about ADUs in Mid City West

How many ADUs have been permitted in Mid City West?

The City of Los Angeles issued 586 permits for ADUs in Mid City West from 2020 through Oct 31, 2026, including 344 garage conversions and 121 detached ADUs.

How long does an ADU permit take in Mid City West?

From application to issued permit, the median in Mid City West was 163 days for garage conversions and 243 days for detached ADUs.

How much does an ADU cost in Mid City West?

The median value declared on permits was $45,000 for garage conversions and $85,000 for detached ADUs. Declared permit values often understate the full construction cost, so get several builder quotes.

How long does it take to build an ADU in Mid City West?

Of the 340 ADU permits issued in Mid City West from 2020 through 2023, including ones that later expired or were cancelled, 82% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 14 months after the permit.

Can I build an ADU on my property in Mid City West?

California law allows ADUs on most residential lots with a house, but what you can build depends on your lot, zoning and hillside or fire-zone rules. This site shows permits, not eligibility; check with the Los Angeles Department of Building and Safety or a licensed builder.

How current is this?

How our data works · Download the data · Free to reuse with credit to SoCal ADU Tracker (socaladutracker.com), under CC BY 4.0.