  • Neighborhood pages cover 2020 onward: City of Los Angeles Department of Building and Safety permits in this neighborhood's Neighborhood Council area, which may not match every local definition of the neighborhood. Build type is classified automatically from permit descriptions.
  • Costs are declared permit valuations (single-ADU permits only), not final construction costs.

Permits by year

202021
202140
202252
202345
202443
202549
2026 so far44
Permits by year and type (table)
YearAll ADU permitsGarage conversionsDetached
202021191
202140287
202252397
202345279
2024432811
202549339
2026 so far442514

“—” means the source for that year does not report ADU type.

Read more: ADU types explained

Not counted: 3 expired or cancelled permits.

How Empowerment Congress West Area compares

ADU rules

Los Angeles' ADU rules apply citywide, with extra rules for hillside, fire-zone and coastal lots: see the rules table.

How long permits take

TypeMedian days, application to permitMiddle halfPermits
Detached ADU222132 – 32058
Attached ADU27994 – 44317
Garage conversion14793 – 276195
Junior ADU (JADU)too few to say8
Unclassified275136 – 35112

Middle half: the range covering the middle 50% of permits (a quarter were lower, a quarter higher).

Read more: How long ADU permits take in Los Angeles (and other cities) · How long ADUs take to build

What happened to these permits

Of the 161 ADU permits issued in Empowerment Congress West Area from 2020 through 2023, including ones that later expired or were cancelled, 73% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 17 months after the permit.

What became of the permitShare
Finished (signed off by the city)73%
Still open25%
Expired or cancelled2%

Expired and cancelled permits aren't in this page's totals; they're included here so the table covers every permit issued. A still-open permit may be under construction or stalled.

What neighbors declared as cost

TypeMedian declared valueMiddle halfPermits
Detached ADU$100,000$64,000 – $135,00045
Attached ADU$50,000$33,500 – $100,00015
Garage conversion$46,500$30,000 – $70,000168
Junior ADU (JADU)too few to say6
Unclassified$32,000$24,000 – $65,00011

Declared permit valuations often understate real construction cost.

Read more: What ADUs cost in Los Angeles

Read more: How to choose an ADU builder

An ADU builder serving Los Angeles? Feature your business on this page.

Recent ADU permits in Empowerment Congress West Area

Street names only. See each permit on the map.

Questions about ADUs in Empowerment Congress West Area

How many ADUs have been permitted in Empowerment Congress West Area?

The City of Los Angeles issued 294 permits for ADUs in Empowerment Congress West Area from 2020 through Oct 31, 2026, including 199 garage conversions and 58 detached ADUs.

How long does an ADU permit take in Empowerment Congress West Area?

From application to issued permit, the median in Empowerment Congress West Area was 147 days for garage conversions and 222 days for detached ADUs.

How much does an ADU cost in Empowerment Congress West Area?

The median value declared on permits was $46,500 for garage conversions and $100,000 for detached ADUs. Declared permit values often understate the full construction cost, so get several builder quotes.

How long does it take to build an ADU in Empowerment Congress West Area?

Of the 161 ADU permits issued in Empowerment Congress West Area from 2020 through 2023, including ones that later expired or were cancelled, 73% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 17 months after the permit.

Can I build an ADU on my property in Empowerment Congress West Area?

California law allows ADUs on most residential lots with a house, but what you can build depends on your lot, zoning and hillside or fire-zone rules. This site shows permits, not eligibility; check with the Los Angeles Department of Building and Safety or a licensed builder.

How current is this?

How our data works · Download the data · Free to reuse with credit to SoCal ADU Tracker (socaladutracker.com), under CC BY 4.0.