  • Neighborhood pages cover 2020 onward: City of Los Angeles Department of Building and Safety permits in this neighborhood's Neighborhood Council area, which may not match every local definition of the neighborhood. Build type is classified automatically from permit descriptions.
  • Costs are declared permit valuations (single-ADU permits only), not final construction costs.

Permits by year

202048
202166
2022118
202381
202472
202597
2026 so far59
Permits by year and type (table)
YearAll ADU permitsGarage conversionsDetached
2020482914
2021664215
20221186931
2023814231
2024724122
2025975029
2026 so far592817

“—” means the source for that year does not report ADU type.

Read more: ADU types explained

How Empowerment Congress Central Area compares

ADU rules

Los Angeles' ADU rules apply citywide, with extra rules for hillside, fire-zone and coastal lots: see the rules table.

How long permits take

TypeMedian days, application to permitMiddle halfPermits
Detached ADU221117 – 344157
Attached ADU14379 – 31346
Garage conversion16186 – 300299
Junior ADU (JADU)6034 – 28113
Unclassified190111 – 37620

Middle half: the range covering the middle 50% of permits (a quarter were lower, a quarter higher).

Read more: How long ADU permits take in Los Angeles (and other cities) · How long ADUs take to build

What happened to these permits

Of the 313 ADU permits issued in Empowerment Congress Central Area from 2020 through 2023, including ones that later expired or were cancelled, 76% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 14 months after the permit.

What became of the permitShare
Finished (signed off by the city)76%
Still open24%
Expired or cancelled0%
Closed or other status<1%

Expired and cancelled permits aren't in this page's totals; they're included here so the table covers every permit issued. A still-open permit may be under construction or stalled.

What neighbors declared as cost

TypeMedian declared valueMiddle halfPermits
Detached ADU$90,000$69,697 – $128,750138
Attached ADU$45,000$30,000 – $70,00041
Garage conversion$50,000$35,000 – $70,000284
Junior ADU (JADU)$35,000$17,920 – $50,00013
Unclassified$55,000$38,750 – $90,00018

Declared permit valuations often understate real construction cost.

Read more: What ADUs cost in Los Angeles

Read more: How to choose an ADU builder

An ADU builder serving Los Angeles? Feature your business on this page.

Recent ADU permits in Empowerment Congress Central Area

Street names only. See each permit on the map.

Questions about ADUs in Empowerment Congress Central Area

How many ADUs have been permitted in Empowerment Congress Central Area?

The City of Los Angeles issued 541 permits for ADUs in Empowerment Congress Central Area from 2020 through Oct 31, 2026, including 301 garage conversions and 159 detached ADUs.

How long does an ADU permit take in Empowerment Congress Central Area?

From application to issued permit, the median in Empowerment Congress Central Area was 161 days for garage conversions and 221 days for detached ADUs.

How much does an ADU cost in Empowerment Congress Central Area?

The median value declared on permits was $50,000 for garage conversions and $90,000 for detached ADUs. Declared permit values often understate the full construction cost, so get several builder quotes.

How long does it take to build an ADU in Empowerment Congress Central Area?

Of the 313 ADU permits issued in Empowerment Congress Central Area from 2020 through 2023, including ones that later expired or were cancelled, 76% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 14 months after the permit.

Can I build an ADU on my property in Empowerment Congress Central Area?

California law allows ADUs on most residential lots with a house, but what you can build depends on your lot, zoning and hillside or fire-zone rules. This site shows permits, not eligibility; check with the Los Angeles Department of Building and Safety or a licensed builder.

How current is this?

How our data works · Download the data · Free to reuse with credit to SoCal ADU Tracker (socaladutracker.com), under CC BY 4.0.