Public-record permit data only — not zoning, feasibility, or legal advice. Records may be incomplete, delayed, or mis-categorized. Check with your city planning department.
About this data
  • Neighborhood pages cover 2020 onward: City of Los Angeles Department of Building and Safety permits in this neighborhood's Neighborhood Council area, which may not match every local definition of the neighborhood. Build type is classified automatically from permit descriptions.
  • Costs are declared permit valuations (single-ADU permits only), not final construction costs.

Permits by year

202043
202180
2022135
2023113
2024129
2025117
2026 so far81
Permits by year and type (table)
YearAll ADU permitsGarage conversionsDetached
2020432010
2021804617
20221355635
20231134341
20241295339
20251174645
2026 so far812131

“—” means the source for that year does not report ADU type.

Read more: ADU types explained

Not counted: 2 expired or cancelled permits.

How Empowerment Congress North Area compares

ADU rules

Los Angeles' ADU rules apply citywide, with extra rules for hillside, fire-zone and coastal lots: see the rules table.

How long permits take

TypeMedian days, application to permitMiddle halfPermits
Detached ADU224130 – 383216
Attached ADU224126 – 358150
Garage conversion16790 – 324281
Junior ADU (JADU)too few to say3
Unclassified234128 – 40534

Middle half: the range covering the middle 50% of permits (a quarter were lower, a quarter higher).

Read more: How long ADU permits take in Los Angeles (and other cities) · How long ADUs take to build

What happened to these permits

Of the 373 ADU permits issued in Empowerment Congress North Area from 2020 through 2023, including ones that later expired or were cancelled, 84% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 14 months after the permit.

What became of the permitShare
Finished (signed off by the city)84%
Still open15%
Expired or cancelled1%
Closed or other status<1%

Expired and cancelled permits aren't in this page's totals; they're included here so the table covers every permit issued. A still-open permit may be under construction or stalled.

What neighbors declared as cost

TypeMedian declared valueMiddle halfPermits
Detached ADU$120,000$80,400 – $150,000151
Attached ADU$57,500$28,750 – $107,64488
Garage conversion$50,000$35,000 – $80,000261
Junior ADU (JADU)too few to say4
Unclassified$50,000$22,165 – $100,00025

Declared permit valuations often understate real construction cost.

Read more: What ADUs cost in Los Angeles

Read more: How to choose an ADU builder

An ADU builder serving Los Angeles? Feature your business on this page.

Recent ADU permits in Empowerment Congress North Area

Street names only. See each permit on the map.

Questions about ADUs in Empowerment Congress North Area

How many ADUs have been permitted in Empowerment Congress North Area?

The City of Los Angeles issued 698 permits for ADUs in Empowerment Congress North Area from 2020 through Oct 31, 2026, including 285 garage conversions and 218 detached ADUs.

How long does an ADU permit take in Empowerment Congress North Area?

From application to issued permit, the median in Empowerment Congress North Area was 167 days for garage conversions and 224 days for detached ADUs.

How much does an ADU cost in Empowerment Congress North Area?

The median value declared on permits was $50,000 for garage conversions and $120,000 for detached ADUs. Declared permit values often understate the full construction cost, so get several builder quotes.

How long does it take to build an ADU in Empowerment Congress North Area?

Of the 373 ADU permits issued in Empowerment Congress North Area from 2020 through 2023, including ones that later expired or were cancelled, 84% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 14 months after the permit.

Can I build an ADU on my property in Empowerment Congress North Area?

California law allows ADUs on most residential lots with a house, but what you can build depends on your lot, zoning and hillside or fire-zone rules. This site shows permits, not eligibility; check with the Los Angeles Department of Building and Safety or a licensed builder.

How current is this?

How our data works · Download the data · Free to reuse with credit to SoCal ADU Tracker (socaladutracker.com), under CC BY 4.0.