Public-record permit data only — not zoning, feasibility, or legal advice. Records may be incomplete, delayed, or mis-categorized. Check with your city planning department.
About this data
  • Neighborhood pages cover 2020 onward: City of Los Angeles Department of Building and Safety permits in this neighborhood's Neighborhood Council area, which may not match every local definition of the neighborhood. Build type is classified automatically from permit descriptions.
  • Costs are declared permit valuations (single-ADU permits only), not final construction costs.

Permits by year

2020153
2021201
2022241
2023204
2024209
2025257
2026 so far168
Permits by year and type (table)
YearAll ADU permitsGarage conversionsDetached
20201538938
202120110549
202224110866
20232049067
20242097865
20252579778
2026 so far1685951

“—” means the source for that year does not report ADU type.

Read more: ADU types explained

Not counted: 3 expired or cancelled permits.

How Reseda compares

ADU rules

Los Angeles' ADU rules apply citywide, with extra rules for hillside, fire-zone and coastal lots: see the rules table.

How long permits take

TypeMedian days, application to permitMiddle halfPermits
Detached ADU179100 – 301410
Attached ADU11050 – 196139
Garage conversion9146 – 168620
Junior ADU (JADU)7840 – 165217
Unclassified11661 – 24933

Middle half: the range covering the middle 50% of permits (a quarter were lower, a quarter higher).

Read more: How long ADU permits take in Los Angeles (and other cities) · How long ADUs take to build

What happened to these permits

Of the 802 ADU permits issued in Reseda from 2020 through 2023, including ones that later expired or were cancelled, 85% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 10 months after the permit.

What became of the permitShare
Finished (signed off by the city)85%
Still open14%
Expired or cancelled<1%
Closed or other status1%

Expired and cancelled permits aren't in this page's totals; they're included here so the table covers every permit issued. A still-open permit may be under construction or stalled.

What neighbors declared as cost

TypeMedian declared valueMiddle halfPermits
Detached ADU$117,910$80,200 – $140,000394
Attached ADU$45,000$20,000 – $90,000106
Garage conversion$45,000$30,000 – $70,000602
Junior ADU (JADU)$31,000$20,000 – $50,000207
Unclassified$44,500$21,500 – $62,50030

Declared permit valuations often understate real construction cost.

Read more: What ADUs cost in Los Angeles

Read more: How to choose an ADU builder

An ADU builder serving Los Angeles? Feature your business on this page.

Recent ADU permits in Reseda

Street names only. See each permit on the map.

Questions about ADUs in Reseda

How many ADUs have been permitted in Reseda?

The City of Los Angeles issued 1,433 permits for ADUs in Reseda from 2020 through Oct 31, 2026, including 626 garage conversions and 414 detached ADUs.

How long does an ADU permit take in Reseda?

From application to issued permit, the median in Reseda was 91 days for garage conversions and 179 days for detached ADUs.

How much does an ADU cost in Reseda?

The median value declared on permits was $45,000 for garage conversions and $117,910 for detached ADUs. Declared permit values often understate the full construction cost, so get several builder quotes.

How long does it take to build an ADU in Reseda?

Of the 802 ADU permits issued in Reseda from 2020 through 2023, including ones that later expired or were cancelled, 85% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 10 months after the permit.

Can I build an ADU on my property in Reseda?

California law allows ADUs on most residential lots with a house, but what you can build depends on your lot, zoning and hillside or fire-zone rules. This site shows permits, not eligibility; check with the Los Angeles Department of Building and Safety or a licensed builder.

How current is this?

How our data works · Download the data · Free to reuse with credit to SoCal ADU Tracker (socaladutracker.com), under CC BY 4.0.