Public-record permit data only — not zoning, feasibility, or legal advice. Records may be incomplete, delayed, or mis-categorized. Check with your city planning department.
About this data
  • Neighborhood pages cover 2020 onward: City of Los Angeles Department of Building and Safety permits in this neighborhood's Neighborhood Council area, which may not match every local definition of the neighborhood. Build type is classified automatically from permit descriptions.
  • Costs are declared permit valuations (single-ADU permits only), not final construction costs.

Permits by year

202093
2021134
2022220
2023193
2024284
2025265
2026 so far189
Permits by year and type (table)
YearAll ADU permitsGarage conversionsDetached
2020936214
20211347130
202222010565
20231938562
202428411789
202526510080
2026 so far1898544

“—” means the source for that year does not report ADU type.

Read more: ADU types explained

Not counted: 4 expired or cancelled permits.

How Granada Hills compares

ADU rules

Los Angeles' ADU rules apply citywide, with extra rules for hillside, fire-zone and coastal lots: see the rules table.

How long permits take

TypeMedian days, application to permitMiddle halfPermits
Detached ADU185106 – 309377
Attached ADU12961 – 250136
Garage conversion8140 – 154623
Junior ADU (JADU)6834 – 127196
Unclassified14065 – 34035

Middle half: the range covering the middle 50% of permits (a quarter were lower, a quarter higher).

Read more: How long ADU permits take in Los Angeles (and other cities) · How long ADUs take to build

What happened to these permits

Of the 644 ADU permits issued in Granada Hills from 2020 through 2023, including ones that later expired or were cancelled, 85% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 13 months after the permit.

What became of the permitShare
Finished (signed off by the city)85%
Still open14%
Expired or cancelled1%
Closed or other status<1%

Expired and cancelled permits aren't in this page's totals; they're included here so the table covers every permit issued. A still-open permit may be under construction or stalled.

What neighbors declared as cost

TypeMedian declared valueMiddle halfPermits
Detached ADU$120,000$80,000 – $150,000371
Attached ADU$54,000$30,000 – $99,00095
Garage conversion$50,000$30,000 – $72,000613
Junior ADU (JADU)$30,000$20,000 – $45,000182
Unclassified$72,500$36,250 – $100,00030

Declared permit valuations often understate real construction cost.

Read more: What ADUs cost in Los Angeles

Read more: How to choose an ADU builder

An ADU builder serving Los Angeles? Feature your business on this page.

Recent ADU permits in Granada Hills

Street names only. See each permit on the map.

Questions about ADUs in Granada Hills

How many ADUs have been permitted in Granada Hills?

The City of Los Angeles issued 1,378 permits for ADUs in Granada Hills from 2020 through Oct 31, 2026, including 625 garage conversions and 384 detached ADUs.

How long does an ADU permit take in Granada Hills?

From application to issued permit, the median in Granada Hills was 81 days for garage conversions and 185 days for detached ADUs.

How much does an ADU cost in Granada Hills?

The median value declared on permits was $50,000 for garage conversions and $120,000 for detached ADUs. Declared permit values often understate the full construction cost, so get several builder quotes.

How long does it take to build an ADU in Granada Hills?

Of the 644 ADU permits issued in Granada Hills from 2020 through 2023, including ones that later expired or were cancelled, 85% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 13 months after the permit.

Can I build an ADU on my property in Granada Hills?

California law allows ADUs on most residential lots with a house, but what you can build depends on your lot, zoning and hillside or fire-zone rules. This site shows permits, not eligibility; check with the Los Angeles Department of Building and Safety or a licensed builder.

How current is this?

How our data works · Download the data · Free to reuse with credit to SoCal ADU Tracker (socaladutracker.com), under CC BY 4.0.