Public-record permit data only — not zoning, feasibility, or legal advice. Records may be incomplete, delayed, or mis-categorized. Check with your city planning department.
About this data
  • Neighborhood pages cover 2020 onward: City of Los Angeles Department of Building and Safety permits in this neighborhood's Neighborhood Council area, which may not match every local definition of the neighborhood. Build type is classified automatically from permit descriptions.
  • Costs are declared permit valuations (single-ADU permits only), not final construction costs.

Permits by year

202046
202161
202277
202376
202480
2025107
2026 so far58
Permits by year and type (table)
YearAll ADU permitsGarage conversionsDetached
2020462214
2021613412
2022774312
2023763218
2024803016
20251074724
2026 so far582511

“—” means the source for that year does not report ADU type.

Read more: ADU types explained

Not counted: 5 expired or cancelled permits.

How Westside compares

ADU rules

Los Angeles' ADU rules apply citywide, with extra rules for hillside, fire-zone and coastal lots: see the rules table.

How long permits take

TypeMedian days, application to permitMiddle halfPermits
Detached ADU195129 – 309105
Attached ADU16898 – 267109
Garage conversion15289 – 295231
Junior ADU (JADU)6240 – 17023
Unclassified166112 – 28331

Middle half: the range covering the middle 50% of permits (a quarter were lower, a quarter higher).

Read more: How long ADU permits take in Los Angeles (and other cities) · How long ADUs take to build

What happened to these permits

Of the 265 ADU permits issued in Westside from 2020 through 2023, including ones that later expired or were cancelled, 87% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 15 months after the permit.

What became of the permitShare
Finished (signed off by the city)87%
Still open10%
Expired or cancelled2%
Closed or other status1%

Expired and cancelled permits aren't in this page's totals; they're included here so the table covers every permit issued. A still-open permit may be under construction or stalled.

What neighbors declared as cost

TypeMedian declared valueMiddle halfPermits
Detached ADU$89,000$55,000 – $120,000102
Attached ADU$100,000$30,000 – $285,81272
Garage conversion$45,000$30,000 – $65,000226
Junior ADU (JADU)$40,000$20,000 – $135,00023
Unclassified$30,000$20,000 – $70,00029

Declared permit valuations often understate real construction cost.

Read more: What ADUs cost in Los Angeles

Read more: How to choose an ADU builder

An ADU builder serving Los Angeles? Feature your business on this page.

Recent ADU permits in Westside

Street names only. See each permit on the map.

Questions about ADUs in Westside

How many ADUs have been permitted in Westside?

The City of Los Angeles issued 505 permits for ADUs in Westside from 2020 through Oct 31, 2026, including 233 garage conversions and 107 detached ADUs.

How long does an ADU permit take in Westside?

From application to issued permit, the median in Westside was 152 days for garage conversions and 195 days for detached ADUs.

How much does an ADU cost in Westside?

The median value declared on permits was $45,000 for garage conversions and $89,000 for detached ADUs. Declared permit values often understate the full construction cost, so get several builder quotes.

How long does it take to build an ADU in Westside?

Of the 265 ADU permits issued in Westside from 2020 through 2023, including ones that later expired or were cancelled, 87% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 15 months after the permit.

Can I build an ADU on my property in Westside?

California law allows ADUs on most residential lots with a house, but what you can build depends on your lot, zoning and hillside or fire-zone rules. This site shows permits, not eligibility; check with the Los Angeles Department of Building and Safety or a licensed builder.

How current is this?

How our data works · Download the data · Free to reuse with credit to SoCal ADU Tracker (socaladutracker.com), under CC BY 4.0.