Public-record permit data only — not zoning, feasibility, or legal advice. Records may be incomplete, delayed, or mis-categorized. Check with your city planning department.
About this data
  • Neighborhood pages cover 2020 onward: City of Los Angeles Department of Building and Safety permits in this neighborhood's Neighborhood Council area, which may not match every local definition of the neighborhood. Build type is classified automatically from permit descriptions.
  • Costs are declared permit valuations (single-ADU permits only), not final construction costs.

Permits by year

20208
202119
202233
202331
202435
202539
2026 so far30
Permits by year and type (table)
YearAll ADU permitsGarage conversionsDetached
2020842
20211997
2022331312
202331139
2024351415
2025391319
2026 so far30614

“—” means the source for that year does not report ADU type.

Read more: ADU types explained

How Harbor Gateway South compares

ADU rules

Los Angeles' ADU rules apply citywide, with extra rules for hillside, fire-zone and coastal lots: see the rules table.

How long permits take

TypeMedian days, application to permitMiddle halfPermits
Detached ADU220135 – 37877
Attached ADU21794 – 29325
Garage conversion14887 – 37372
Junior ADU (JADU)22448 – 40312
Unclassifiedtoo few to say7

Middle half: the range covering the middle 50% of permits (a quarter were lower, a quarter higher).

Read more: How long ADU permits take in Los Angeles (and other cities) · How long ADUs take to build

What happened to these permits

Of the 91 ADU permits issued in Harbor Gateway South from 2020 through 2023, including ones that later expired or were cancelled, 89% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 12 months after the permit.

What became of the permitShare
Finished (signed off by the city)89%
Still open10%
Expired or cancelled0%
Closed or other status1%

Expired and cancelled permits aren't in this page's totals; they're included here so the table covers every permit issued. A still-open permit may be under construction or stalled.

What neighbors declared as cost

TypeMedian declared valueMiddle halfPermits
Detached ADU$120,000$100,000 – $177,30064
Attached ADU$90,000$40,000 – $112,04917
Garage conversion$55,000$41,000 – $80,00067
Junior ADU (JADU)too few to say8
Unclassifiedtoo few to say6

Declared permit valuations often understate real construction cost.

Read more: What ADUs cost in Los Angeles

Read more: How to choose an ADU builder

An ADU builder serving Los Angeles? Feature your business on this page.

Recent ADU permits in Harbor Gateway South

Street names only. See each permit on the map.

Questions about ADUs in Harbor Gateway South

How many ADUs have been permitted in Harbor Gateway South?

The City of Los Angeles issued 195 permits for ADUs in Harbor Gateway South from 2020 through Oct 31, 2026, including 72 garage conversions and 78 detached ADUs.

How long does an ADU permit take in Harbor Gateway South?

From application to issued permit, the median in Harbor Gateway South was 148 days for garage conversions and 220 days for detached ADUs.

How much does an ADU cost in Harbor Gateway South?

The median value declared on permits was $55,000 for garage conversions and $120,000 for detached ADUs. Declared permit values often understate the full construction cost, so get several builder quotes.

How long does it take to build an ADU in Harbor Gateway South?

Of the 91 ADU permits issued in Harbor Gateway South from 2020 through 2023, including ones that later expired or were cancelled, 89% have been signed off by the city as finished. Where the certificate of occupancy date is recorded, it came a median of 12 months after the permit.

Can I build an ADU on my property in Harbor Gateway South?

California law allows ADUs on most residential lots with a house, but what you can build depends on your lot, zoning and hillside or fire-zone rules. This site shows permits, not eligibility; check with the Los Angeles Department of Building and Safety or a licensed builder.

How current is this?

How our data works · Download the data · Free to reuse with credit to SoCal ADU Tracker (socaladutracker.com), under CC BY 4.0.